ZM-TT8 Drummed Asphalt Melting Equipment
Hangzhou ICOM Construction Machinery Co.,Ltd
Main technical description of ZM-TT8 Drummed Asphalt Melting Equipment
1 Main Technical Description
The design of double-unit structure is adopted for ZM-TT8 Drummed Asphalt Melting Equipment, composed
of the asphalt dumping main equipment unit and the heat-conducting oil boiler unit, and the form of frame
structure is applied to its both main-body structures, for the strength and the stability of the units to be
reliably ensured. Stainless steel corrugated pipe flexible connection is adopted for the pipeline connection
between the two units, typical of simple site dismantlement and installation as well as convenient transportation
especially adaptable to installation and construction on overseas construction sites. Heat-conducting oil
“S” coil pipe is mainly employed for heating of the dumping unit, and at the same time the combustion waste
gas of the heat-conducting oil boiler is utilized for auxiliary heating, which has effectively improved the
fuel utilization efficiency, and reduced energy consumption
Model |
ZM-TT8 |
Productivity(t/h) (Environment temperature≥25℃) |
8 |
Bitumen temperature(℃) |
130-160 |
No. Barrels(Barrel/set) |
30 |
Bitumen storage volume m3 |
12 |
Heat conducting oil boiler |
YYW720-Y(Q) |
Boiler capacity (kw) |
720 |
Boiler temp. (℃) |
210-240 |
Boiler dimension (L×W×H)(mm) |
5700X2300X2300 |
Windlass |
Model: JM0.3 ;Power:1.1 kw Speed: 11m/min |
Induced draft fan |
Model: Y5-47,Power:3 kw Flux: 4070m3/h,Wind pressure: 890Pa |
Asphalt pump |
Model: YCB-25, Power:7.5 kw Flux: 25m3/h |
Trolley Decelerate |
Model: JRTS77D100L4/B Power: 3KW Out rpm: 26 r/min |
Max. Trolley Working speed |
Speed:11.45 m/min |
Total power (kw) |
< 30 |
Total weight (t) |
18. |
Total Dimension (didn’t include boiler) (L×W×H)(mm) |
11000×2550×2600 |